Keminmaa
Under construction

Rajakangas

Area size, ha
0
Available Power, MW
0
Available capacity at grid point, MW
0
Land plots, PC
0

Rajakangas is a highly accessible industrial and logistics zone located at the intersection of major highways E8 and E75. The area offers flexible plots for small to mid-size industrial investments, with the possibility to connect to the regional industrial rail network. A default electrical capacity of around 4 MW provides a solid starting point, and further expansions are possible depending on project scale.

With its transport advantages and adaptable infrastructure, Rajakangas is an attractive option for P2X projects, energy-intensive production, or modular industrial development. Investors benefit from quick logistics, cost-efficient land availability and proximity to key nodes in the SeaLapland industrial region.

Interactive map of industrial site

Site key figures

Basic Site Information

Total Area, ha30
Largest Individual Plot, ha
Number of Plots
Site Type, Greenfield / Brownfield

Zoning status

Current Zoning
Chemical Zoning Initiated (Yes/No)
Estimated Completion of Zoning Plan (MM/YYYY)

Electricity Grid

Available Electrical Capacity, MW
Grid Voltage, kV
Distance to Main Grid Connection Point, km
Available Capacity at Connection Point, MW
Is Grid Reinforcement Planned?
Estimated Completion (Month – Year)

Water Availability

Available Water Volume, m³/year
Distance to Freshwater Source, km
Distance to Seawater, km

District Heating

Maximum District Heating Capacity, MW
Distance to District Heating Network, km

Logistics

Distance to Primary Port, km
Primary Port Draft, m
Primary Port Name
Distance to Secondary Port, km
Secondary Port Draft, m
Secondary Port Name
Distance to Railway, km
Possibility to Build a Railway Connection, Yes / No

Distance to CO₂ Sources

Distance to Transmission Infra

Documents

Contact for more information

Hannele MatinlassiMayor, Municipality of Keminmaa+358 40 831 7758[email protected]
Link to site website

Industry news

Join us in Sea-Lapland for high-level event aimed at accelerating hydrogen economy investments and building a coordinated regional ecosystem. Sea-Lapland is entering a new phase of hydrogen and P2X development, with major industrial players, municipalities and infrastructure operators working together to build a coordinated ecosystem. This event offers direct access to the people shaping that process and the information needed for future investment decisions. Please list your areas of interest for the afternoon Meet & Greet session when registering, so we can tailor the discussions to your needs. As soon as the agenda is finalised, we will share it with all participants. At this stage, please note that the departure from Oulu for the site visit is at 7:30, in front of the famous Toripoliisi statue. The return to Oulu will be no later than around 16:30.

Digipolis

See other Industrial Sites

View all
In planning
Tornio
75.5 ha
100 Mw
In planning
Tornio
150 ha
0 Mw
Under construction
Keminmaa
30 ha
100 Mw
In planning
Kemi
350 ha
0 Mw
Operational
Kemi
190 ha
10 Mw
Operational
Kemi
70 ha
20 Mw
In planning
Simo
100 ha
0 Mw
Under construction
Simo
22 ha
0 Mw