Tornio
In planning

Arctio North

Area size, ha
0
Saatavilla oleva sähköteho, MW
0
Vapaa kapasiteetti liityntäpisteessä, MW
0
Tonttien lukumäärä, kpl
0

Arctio North complements the southern zone by offering additional industrial land for projects requiring space, logistics and integration with Tornio’s established heavy-industry cluster. Its northern positioning supports development of new manufacturing or energy-related operations that benefit from short distances to both port infrastructure and regional transport routes.

For investors seeking long-term capacity to grow, Arctio North provides flexibility and a direct link to Tornio’s industrial capabilities, enabling hydrogen, P2X or electrified industrial concepts to seamlessly integrate into an expanding regional ecosystem.

Interactive map of industrial site

Site key figures

Basic Site Information

Total Area, ha150 ha
Largest Individual Plot, ha50 ha
Number of Plots4 PC
Site Type, Greenfield / BrownfieldGreenfield

Zoning status

Current ZoningForestry land
Chemical Zoning Initiated (Yes/No)Yes
Estimated Completion of Zoning Plan (MM/YYYY)2026

Electricity Grid

Available Electrical Capacity, MW
Grid Voltage, kV400 kV
Distance to Main Grid Connection Point, km10 km
Available Capacity at Connection Point, MW+ 500 MW
Is Grid Reinforcement Planned?Yes
Estimated Completion (Month – Year)

Water Availability

Available Water Volume, m³/year
Distance to Freshwater Source, km7 km
Distance to Seawater, km3 km

District Heating

Maximum District Heating Capacity, MW
Distance to District Heating Network, km

Logistics

Distance to Primary Port, km10 km
Primary Port Draft, m9,5 m
Primary Port NamePort of Röyttä (Tornio)
Distance to Secondary Port, km25 km
Secondary Port Draft, m12,5 m
Secondary Port NamePort of Ajos
Distance to Railway, km6 km
Possibility to Build a Railway Connection, Yes / NoYes

Distance to CO₂ Sources

Distance to Transmission Infra

Contact for more information

Tero SiivolaCEO, Business Tornio Oy+358 40 358 5888[email protected]
Link to site website

Industry news

Join us in Sea-Lapland for high-level event aimed at accelerating hydrogen economy investments and building a coordinated regional ecosystem. Sea-Lapland is entering a new phase of hydrogen and P2X development, with major industrial players, municipalities and infrastructure operators working together to build a coordinated ecosystem. This event offers direct access to the people shaping that process and the information needed for future investment decisions. Please list your areas of interest for the afternoon Meet & Greet session when registering, so we can tailor the discussions to your needs. As soon as the agenda is finalised, we will share it with all participants. At this stage, please note that the departure from Oulu for the site visit is at 7:30, in front of the famous Toripoliisi statue. The return to Oulu will be no later than around 16:30.

Digipolis

See other Industrial Sites

View all
In planning
Tornio
75.5 ha
100 Mw
In planning
Tornio
150 ha
0 Mw
Under construction
Keminmaa
30 ha
100 Mw
In planning
Kemi
350 ha
0 Mw
Operational
Kemi
190 ha
10 Mw
Operational
Kemi
70 ha
20 Mw
In planning
Simo
100 ha
0 Mw
Under construction
Simo
22 ha
0 Mw