Tornio
In planning

Arctio South

Area size, ha
0
Available Power, MW
0
Available capacity at grid point, MW
0
Land plots, PC
0

Arctio South represents one of Tornio’s emerging industrial zones, positioned close to key transport corridors and the Swedish border. The area provides a strong foundation for heavy-industry expansion, energy-intensive processes, and cross-border collaboration within the Bothnian Arc. With excellent road connections and proximity to existing industrial operations, the zone is well-suited for hydrogen offtake, new electrified industry, and Power-to-X opportunities.

For hydrogen-sector investors, Arctio South offers a strategic location for scalable projects that benefit from regional industrial synergies. Its cross-border accessibility and expanding infrastructure make it a natural hub for Nordic–EU value chains, export-oriented manufacturing and future low-carbon production ecosystems.

Interactive map of industrial site

Site key figures

Basic Site Information

Total Area, ha
Largest Individual Plot, ha
Number of Plots
Site Type, Greenfield / Brownfield

Zoning status

Current Zoning
Chemical Zoning Initiated (Yes/No)
Estimated Completion of Zoning Plan (MM/YYYY)

Electricity Grid

Available Electrical Capacity, MW
Grid Voltage, kV
Distance to Main Grid Connection Point, km
Available Capacity at Connection Point, MW
Is Grid Reinforcement Planned?
Estimated Completion (Month – Year)

Water Availability

Available Water Volume, m³/year
Distance to Freshwater Source, km
Distance to Seawater, km

District Heating

Maximum District Heating Capacity, MW
Distance to District Heating Network, km

Logistics

Distance to Primary Port, km
Primary Port Draft, m
Primary Port Name
Distance to Secondary Port, km
Secondary Port Draft, m
Secondary Port Name
Distance to Railway, km
Possibility to Build a Railway Connection, Yes / No

Distance to CO₂ Sources

Distance to Transmission Infra

Documents

Contact for more information

Tero SiivolaCEO, Business Tornio Oy+358 40 358 5888[email protected]
Link to site website

Industry news

Join us in Sea-Lapland for high-level event aimed at accelerating hydrogen economy investments and building a coordinated regional ecosystem. Sea-Lapland is entering a new phase of hydrogen and P2X development, with major industrial players, municipalities and infrastructure operators working together to build a coordinated ecosystem. This event offers direct access to the people shaping that process and the information needed for future investment decisions. Please list your areas of interest for the afternoon Meet & Greet session when registering, so we can tailor the discussions to your needs. As soon as the agenda is finalised, we will share it with all participants. At this stage, please note that the departure from Oulu for the site visit is at 7:30, in front of the famous Toripoliisi statue. The return to Oulu will be no later than around 16:30.

Digipolis

See other Industrial Sites

View all
In planning
Tornio
75.5 ha
100 Mw
In planning
Tornio
150 ha
0 Mw
Under construction
Keminmaa
30 ha
100 Mw
In planning
Kemi
350 ha
0 Mw
Operational
Kemi
190 ha
10 Mw
Operational
Kemi
70 ha
20 Mw
In planning
Simo
100 ha
0 Mw
Under construction
Simo
22 ha
0 Mw