Simo
Under construction

Hittikka

Area size, ha
0
Available Power, MW
0
Capacity at grid point, MW
0
Land plots, PC
0

Hittikka is a compact, cost-efficient industrial and logistics area with potential rail reservation and good connections to the regional transport network. The site is suitable for small to medium-sized industry, modular P2X plants, warehousing or other energy-intensive operations that require reliable land availability and straightforward logistics.

Hittikka provides a practical entry point into the SeaLapland industrial ecosystem, offering affordability and adaptability for investors aiming to establish operations quickly while retaining the option to scale or integrate with larger regional industrial flows.

Interactive map of industrial site

Site key figures

Basic Site Information

Total Area, ha22 ha
Largest Individual Plot, ha22 ha
Number of Plots5 PC
Site Type, Greenfield / BrownfieldGreenfield

Zoning status

Current ZoningIndustrial Zoning
Chemical Zoning Initiated (Yes/No)No
Estimated Completion of Zoning Plan (MM/YYYY)-

Electricity Grid

Available Electrical Capacity, MW0 MW
Grid Voltage, kV110 kV
Distance to Main Grid Connection Point, km6 km
Available Capacity at Connection Point, MW+500 MW
Is Grid Reinforcement Planned?Yes
Estimated Completion (Month – Year)2030

Water Availability

Available Water Volume, m³/year0
Distance to Freshwater Source, km2 km
Distance to Seawater, km4 km

District Heating

Maximum District Heating Capacity, MW
Distance to District Heating Network, km5 km

Logistics

Distance to Primary Port, km27 km
Primary Port Draft, m12,5 m
Primary Port NamePort of Ajos
Distance to Secondary Port, km25 km
Secondary Port Draft, m6,5 m
Secondary Port NamePort of Veitsiluoto
Distance to Railway, km0 km
Possibility to Build a Railway Connection, Yes / NoYes

Distance to Transmission Infra

Documents

Contact for more information

Vivi MarttilaMayor, Municipality of Simo+358 50 5755 450[email protected]
Link to site website

Industry news

Join us in Sea-Lapland for high-level event aimed at accelerating hydrogen economy investments and building a coordinated regional ecosystem. Sea-Lapland is entering a new phase of hydrogen and P2X development, with major industrial players, municipalities and infrastructure operators working together to build a coordinated ecosystem. This event offers direct access to the people shaping that process and the information needed for future investment decisions. Please list your areas of interest for the afternoon Meet & Greet session when registering, so we can tailor the discussions to your needs. As soon as the agenda is finalised, we will share it with all participants. At this stage, please note that the departure from Oulu for the site visit is at 7:30, in front of the famous Toripoliisi statue. The return to Oulu will be no later than around 16:30.

Digipolis

See other Industrial Sites

View all
In planning
Tornio
75.5 ha
100 Mw
In planning
Tornio
150 ha
0 Mw
Under construction
Keminmaa
30 ha
100 Mw
In planning
Kemi
350 ha
0 Mw
Operational
Kemi
190 ha
10 Mw
Operational
Kemi
70 ha
20 Mw
In planning
Simo
100 ha
0 Mw
Under construction
Simo
22 ha
0 Mw