Kemi
In planning

Kemi East

Alueen kokonaispinta-ala, ha
0
Saatavilla oleva sähköteho, MW
0
Vapaa kapasiteetti liityntäpisteessä, MW
0
Tonttien lukumäärä, kpl
0

Kemi East provides large-scale industrial land with excellent access to municipal infrastructure, the port and the broader transport network. The area is well-suited to modular manufacturing, distributed energy solutions and large-size P2X concepts that benefit from manageable logistics and strong regional connections.

Investors seeking a balanced mix of accessibility, scalability and cost-efficiency will find Kemi East a compelling option. Its proximity to established industrial areas and Kemi’s port strengthens the zone’s suitability for both domestic operations and export-oriented production.

Interactive map of industrial site

Site key figures

Basic Site Information

Total Area, ha350 ha
Largest Individual Plot, ha80 ha
Number of Plots8 PC
Site Type, Greenfield / BrownfieldGreenfield

Zoning status

Current ZoningForestry land
Chemical Zoning Initiated (Yes/No)Yes
Estimated Completion of Zoning Plan (MM/YYYY)12/2026

Electricity Grid

Available Electrical Capacity, MW0 MW
Grid Voltage, kV110 KkV
Distance to Main Grid Connection Point, km18 km
Available Capacity at Connection Point, MW+500 MW
Is Grid Reinforcement Planned?Yes
Estimated Completion (Month – Year)2030

Water Availability

Available Water Volume, m³/year3 000 000 m3
Distance to Freshwater Source, km1 km
Distance to Seawater, km5 km

District Heating

Maximum District Heating Capacity, MW80 MW
Distance to District Heating Network, km2 km

Logistics

Distance to Primary Port, km10 km
Primary Port Draft, m12,5 m
Primary Port NamePort of Ajos
Distance to Secondary Port, km5 km
Secondary Port Draft, m6,5 m
Secondary Port NamePort of Veitsiluoto
Distance to Railway, km2 km
Possibility to Build a Railway Connection, Yes / NoYes

Contact for more information

Kimmo HeikkaCEO, Digipolis Oy+358 40 555 8020[email protected]
Link to site website

Industry news

Join us in Sea-Lapland for high-level event aimed at accelerating hydrogen economy investments and building a coordinated regional ecosystem. Sea-Lapland is entering a new phase of hydrogen and P2X development, with major industrial players, municipalities and infrastructure operators working together to build a coordinated ecosystem. This event offers direct access to the people shaping that process and the information needed for future investment decisions. Please list your areas of interest for the afternoon Meet & Greet session when registering, so we can tailor the discussions to your needs. As soon as the agenda is finalised, we will share it with all participants. At this stage, please note that the departure from Oulu for the site visit is at 7:30, in front of the famous Toripoliisi statue. The return to Oulu will be no later than around 16:30.

Digipolis

See other Industrial Sites

View all
In planning
Tornio
75.5 ha
100 Mw
In planning
Tornio
150 ha
0 Mw
Under construction
Keminmaa
30 ha
100 Mw
In planning
Kemi
350 ha
0 Mw
Operational
Kemi
190 ha
10 Mw
Operational
Kemi
70 ha
20 Mw
In planning
Simo
100 ha
0 Mw
Under construction
Simo
22 ha
0 Mw